Welcome Shanghai Heshuo Water Treatment Equipment Co., Ltd.
简体中文
2024新澳资料正版大全

Service

客户服务

Home - Service

Purified water validation service

Our company has a complete set of pharmaceutical purified water systems and GMP certified purified water equipment for the pharmaceutical industry.

Firstly, the quality of pharmaceutical water should be selected based on the process requirements of drug quality, while meeting the requirements of relevant drug laws and regulations in the country and the target market region.

The current design for purified water involves independent separation of pretreatment, host equipment, and purified water distribution system, modular design, flexible combination, and avoidance of pollution risks, meeting DIN and ASME standards. And the course provides options for hot water disinfection and pure steam disinfection, disinfecting RO and EDI at a temperature greater than 80 ℃, and pre-treatment can also be disinfected at a temperature greater than 80 ℃. The system disinfection fully considers FDA and GMP requirements and meets FDA's online testing requirements.

  • Design confirmation DQ

    Supplier Qualification ConfirmationPersonnel confirmationConfirmation of design documents and drawingsConfirmation of Main Equipment/Components/Key Registration FormConfirmation of construction proceduresSystem Function Confirmation
  • Confirmation Q&OQ for Automatic Control System

    Personnel confirmationPower confirmationCalibration confirmation of testing registration formI/O confirmationSystem file confirmationConfirmation of process parameter designHardware installation confirmationFault confirmation, power outage, and then reply with confirmationSoftware installation confirmation
  • Design confirmation DQ

    Personnel confirmationLeak detection confirmationIQ completion status confirmationConfirmation of operating parametersConfirmation of Operating SOPWater quality confirmationCalibration confirmation of testing instrumentsConfirmation of cycle capabilityI/O testingCIP confirmationAlarm and interlock confirmationCleaning confirmationPassword confirmationMixing confirmationData security confirmationWeight confirmationRun test confirmation
  • Installation confirmation IQ

    Personnel confirmationSlope confirmationDQ completion status confirmationConfirmation of blind spotsSystem file confirmationLow point emission confirmationCalibration confirmation of testing instrumentsConfirmation of electrical componentsManual and parameter confirmationInstallation environment and public design confirmationCertificate ConfirmationConfirmation of P&D Process and Instrument Flow DiagramComponent confirmationWelding confirmation